Construction Plant

All equipments and material will buy by procurement department according to datasheets and material list. and delivery to manufacture. All provided material and equipments will be checked by QC department in manufacture.

QA department

QA department will provide all constriction and test procedures. Also, ITP form will arrange by this department according to technical meeting by client below documents will provide by this department

  • ITP form
  • Fabrication procedure
  • Packing and shipping procedures
  • WPS procedure
  • Painting procedure
  • All required test procedures
  • Other required procedures

all documents from process, mechanical, piping, civil, electrical and QA department will check by head of engineering department manager. all mentioned documents will send for client for checking and approved. Any comments from client will be revised on documents and all approved for construction documents will send to Tonaf manufacture for construction.

QC Department

In Ada manufacture, according to as built drawings and ITP form, chemical dosing package will be construct and all required test will be done by workman under manufacture manager inspection. QC department will follow all construction and installation stages according to procedures. The report of QC inspection will be checked by QA/QC Head manager.

Also, client can announce third inspector company and control all documents and performance by them. After client approved, system will be packed and shipped according to procedure.